Powering the Gulf’s Rail Revolution

Ducab’s high performance power MV cables were selected to handle the rail system’s heavy-duty load requirements. Our cables provide resilient power distribution for the railway system’s signalling, communication, and operational facilities along the route.

PROJECT CONSULTANT/CONTRACTOR

Al Habtoor Specon

DUCAB SUPPLIED

24 km
MV cable – ADDC
400 km
LV cable and wire – ADDC and BS

Other Projects